President's Column

From the Left Seat

From the August 2025 newsletter, by Ray Ballantyne, page 1

Open the PDF at page 1 See the whole August 2025 issue

Hello EAA 430

This month’s Left Seat is dedicated to our building project. We have been through a challenging time trying to establish a home for the chapter.

Beginning in early 2020, Sequim Valley Airport (SVA) was asked if we could build there. The general area where the existing trailer sits and the area to the west was suggested as a good location. SVA was willing to provide a long term lease at no cost. In May of 2024, SVA changed the location offered on the airport excluding the trailer site. We agreed to the site north of the new hangar and worked with SVA on a 50 year lease. Because of county requirements we found that water was a necessity and was not easily obtained.

Exploring all options, the building committee looked at Pt Angeles Fairchild Airport and found a double hangar available for sale with all utilities. It seemed like a slam dunk, but the condominium owners voted against EAA430 having a chapter home there.

Looking back at SVA, we have received a third proposed lease of 30 years at no charge and this is their final offer.

While there is a possible building site at Fairchild, we need to decide whether we accept or decline the SVA lease proposal before August 30, 2025. Discussion with the Board of Directors will take place on August 22. The Board will then present the issues involved to the membership. After that there will be an email ballot to each member to determine if we agree with the SVA lease proposal.

There will be more information provided in the days ahead, but the decision has to be provided to SVA by August 30.

I’m confident it won’t be long before we’re in our new home.

Ray

Search and browse all news & articles